Why have a ground loop commissioned by a third party?

It is critical to have the system commissioned by a third party to ensure the system was installed per the engineer’s design. If it is improperly installed, identifying and assessing problems after installation will be very costly and difficult. This can be avoided with Melink’s third-party commissioning. We will ensure the ground loop is installed […]

Where does the ground loop go?

The ground loop is typically placed under areas with green space or under parking lots; it does not impede future expansion or landscaping. In a new construction project, the ground loop can even be placed under a building.